Kurobe Dam
The tallest dam in Japan, at 186 meters, built among the mountains of the Alpine Route, with a walkway along the top of the dam, a viewpoint and a spillway that usually releases water from late June to mid‑October.
Antarctica
In the photo: Lake Aoki and its tree-lined shores in Omachi.
Illustrative images. The pictures in this guide are illustrations based on the real place, not photographs, and may differ from it.
The city
Omachi is the Nagano town at the foot of the Northern Alps, the eastern gateway to the Tateyama Kurobe Alpine Route. From Shinano-Omachi Station, buses climb to Ogizawa, from where you reach the Kurobe Dam, the tallest dam in Japan. The town has the Omachi Onsen hot springs and the three Nishina lakes, including Lake Aoki.
There's no accommodation in the guide yet in Omachi.
Tem hotel, pousada ou casa de temporada aqui? Cadastre a suaThere are no restaurants in the guide yet in Omachi.
Know a good one? Recommend it to usHotéis e restaurantes da cidade no mapa.
how to get there · how many days · itinerary · questions
The local experience
The tallest dam in Japan, at 186 meters, built among the mountains of the Alpine Route, with a walkway along the top of the dam, a viewpoint and a spillway that usually releases water from late June to mid‑October.
The deepest of the three Nishina lakes, north of Omachi, with clear water surrounded by mountains, beaches for swimming, kayaking and boat rides in summer, and views of the Northern Alps.
Before you go
Omachi – Japan Destination Tateyama Kurobe Alpine Route about 46 km from Nagano
Approximate distances. Check flights and bus, train or boat schedules before you travel.
Shinano-Omachi Station is on the Oito Line, about one hour from Matsumoto, with direct express trains from Shinjuku in Tokyo. Buses link Nagano to Omachi in about one hour. Matsumoto Airport is about 47 km away. From the station, buses take about 40 minutes to Ogizawa.
One day for the Kurobe Dam as a round trip from Ogizawa, or for the full route crossing to Toyama. With two days, include the Nishina lakes and the hot springs.
During the Alpine Route season, typically April to November. From late June to mid-October, the Kurobe Dam often releases water over the spillway. Summer is the season for the lakes; October brings the foliage. In winter the route closes.
The seasons shown are the most usual ones; nature doesn't always follow the calendar.
No. Trains and buses link Omachi to Matsumoto and Nagano, and buses climb to Ogizawa in season. A car helps for reaching the Nishina lakes and combining the trip with Hakuba. Those who drive to Ogizawa park at the station lot.
Suggested itinerary
Built with the places on this page. No rush: it's paced so you have time to see them.
Catch an early bus to Ogizawa and the tunnel electric bus to Kurobe Dam. Go up to the viewpoint and walk across the top of the dam.
Return to Omachi and head to Lake Aoki, the deepest of the three Nishina lakes, with clear water and the Alps as a backdrop.
Finish with a hot-spring bath at Omachi Onsen, on the way to Ogizawa, where inns and public baths are located.
Check before you go. Opening hours and days change, and places may close for renovations, holidays or events. This itinerary is a suggestion from Cidade Turismo, not a commitment: plan yours by checking directly with each place you intend to visit.
Before you go
By bus from Shinano-Omachi Station to Ogizawa, about 40 minutes, and from there by the tunnel’s electric bus to the dam, about 16 minutes. Operates during the Alpine Route season.
Yes. Many people do a round trip from Ogizawa without continuing to Toyama. It’s the quickest way to see the dam.
Yes. Hakuba is about 30 minutes away by train on the Oito Line to the north, and many people use both towns as bases for the Northern Alps.
They are three lakes north of Omachi — Kizaki, Nakatsuna and Aoki — connected by a river, with clear water and views of the Northern Alps.